Hydro-Dock 360 Project

PNRR MISSION 2 "GREEN REVOLUTION AND ECOLOGICAL TRANSITION," COMPONENT 2 "RENEWABLE ENERGY, HYDROGEN, NETWORK, AND SUSTAINABLE MOBILITY," 2024, No. 438
INVESTMENT 3.5 "RESEARCH AND DEVELOPMENT ON HYDROGEN," IN IMPLEMENTATION OF THE DECREE OF THE MINISTER OF THE ENVIRONMENT AND ENERGY SECURITY OF DECEMBER 13, 2024, NO. 438
Hydro-Dock 360 Project
The project develops the theme c) of the Notice (stationary fuel cells, with implications for b) – storage and transport of H₂) through the creation of a ≈ 500 kW containerized generator
based on hybrid PEM fuel cells and second-life batteries, certified for maritime use.
Test environment
– Quays 24/25, Port of Civitavecchia: area with high salt content and dynamic loads; direct connection to STS cranes, reefer sockets, and electrical equipment.
– Refueling distance: 3 km from Civitavecchia's Hydrogen Valley (4.1 MW electrolysis) via mobile transport at 500 bar, with dedicated transfer point
Technical objectives
– Design, assembly, and FAT of the plug-and-play module (TRL 5→7)
– Integration with proprietary Energy Management System to optimize fuel cells, batteries, and port network.
– Operational validation of electrical continuity and emissions reduction (target: -1,900 t CO₂/year).
– Development of advanced multi-parameter and dynamic simulation models of the coupled FC and battery system and optimization of energy flow management.
– Technical-economic and health, safety, and environmental analyses
– Development of a business plan aimed at enhancing the technological, economic, and environmental results of the project
Added value
– First Italian prototype of hydrogen-powered cold ironing in a port setting.
– Accurate measurement of H₂ supply costs thanks to the simplified "last mile" supply chain.
– Model that can be replicated in ports.
– Development of innovative and dynamic models that take into account the optimized management of energy flows in a hybrid FC and battery system.
Expected duration: 12 months;
Final deliverable: CE-certified system ready for industrialization (TRL 8) and cost-benefit report to support future "Green Ports" and hard-to-abate initiatives.
Project partners:
- Assing Inc.
- CFFT Inc.
- Guglielmo Marconi University
Total cost of the research:
€ 3.818.738,75
PNRR funds granted:
€ 2.300.370,63